Welcome Login

You are here

SUBJECT: IMPORTANT CHANGE NOTICE FOR SIN 712 3 Office Relocation/Reconfiguration Management Solutions UNDER SCHEDULE 71 IIK

UPDATE: WEBINAR DATE AND TIME

Meeting Name:  GSA Schedule 48 SIN 653-8 Office Relocation Transition

SummaryThe purpose of this webinar is to share information details about GSA's July 1, 2018 transition of Schedule 48, SIN 653-8 to Schedule 71-II-K (SIN 712-3).The presentation with Q&As will be emailed to SIN 653-8 Schedule contract holders after the webinar.
When:May 31, 2018 at 1:00 PM - 2:00 PM Eastern Time (US and Canada)
Conference Details:Adobe Connect Meeting Space:  https://meet.gsa.gov/sin6538/
Dial-in Phone Numbers:US (Toll): 1-719-325-2013, US (Toll Free): 1-866-928-2008
Participant Code:  674231

----------------
If you have never attended an Adobe Connect meeting before:

 

DISCLAIMER: GSA FAS is posting this notification of a planned solicitation refresh or mass modification as a courtesy to industry. All comments on the attached DRAFT document must be submitted in the `Comments' section below within ten (10) business days of this posting. Comments provided elsewhere or after 10 business days will not be considered. GSA FAS will consider all relevant comments and make changes to the DRAFT as appropriate, but will not issue a formal response to industry comments or related inquiries. Interested parties should review the final version of the solicitation refresh or mass modification closely for additional changes made to this DRAFT.

The General Services Administration (GSA) Federal Acquisition Service (FAS) Integrated Workplace Acquisition Center (IWAC) is planning to refresh GSA Multiple Award Schedule (MAS) 71 IIK to incorporate the following changes:

Schedule 71 IIK, SIN 712 3 Reconfiguration/Relocation Management (Furniture and Furniture Related), will be incorporating Schedule 48, SIN 653 8 Office Relocation and all subsequent contracts. In addition, SIN 712 3 will now read as follows, effective May 15, 2018:

SIN 712 3 Office Relocation/Reconfiguration Management Solutions

A full range of services for relocating and/or reconfiguring existing office furniture, equipment, and related supplies. Services include but are not limited to the following: pre-move planning, relocation plan designing, reorganizing, consolidating, warehousing, staging, packing/crating, loading/unloading, delivery, setup, and related ancillary supplies such as packing materials.

For Existing SIN 712 3 Contract Holders:

No action is required at this time

For Existing 653 8 Contract Holders with no other SINs:

Effective July 1, 2018, SIN 653 8 contracts will be “lifted and shifted” to Schedule 71 IIK. Between the period of July 1 and September 29, 2018, affected contracts will need to individually submit a modification to add SIN 712 3 and delete 653 8.

Effective October 1, 2018, SIN 653 8 will no longer be available.

For Existing 653 8 Contract Holders with other SINs:

SIN 653 8 will be removed from all schedule 48 contracts. To continue offering Office Relocation/Reconfiguration Management Solutions to the government, a contractor must apply for a Schedule 71 IIK, SIN 712 3 contract.

NOTABLE CHANGES:

The SIN 653 8 Office Relocation Services SOW attachment to the Schedule 48 solicitation will be deleted and will not be incorporated into Schedule 71 II K.

The following NAICS codes will be added to Schedule 71 II K SIN 712 3 in conjunction with these changes:

484210 Used Household and Office Goods Moving

This industry comprises establishments primarily engaged in providing local or long-distance trucking of used household, used institutional, or used commercial furniture and equipment. Incidental packing and storage activities are often provided by these establishments.  

488991 Packing and Crating

This U.S. industry comprises establishments primarily engaged in packing, crating, and otherwise preparing goods for transportation.

 

Webinar time and date TBD and will be updated to this post.

 

 

 

 

 

111
Share

Views: 1655

The purpose of this blog platform is to enhance communication and information regarding GSA Schedules. Blog posts on this platform includes in-depth... More

To stay informed on the group's latest updates, subscribe here.

Download the 2019 Summer Quarterly Newsletter

View and comment on posts of proposed Multiple Award Schedules DRAFT solicitation changes (refreshes), and DRAFT mass modifications, prior to their official release.

  • apgleason's picture
    apgleason
  • llbuol's picture
    llbuol
  • destinyl's picture
    destinyl