Welcome Login

You are here

DRAFT EIS RFP Updated Section J.2

This section details the requirements for common operations, process flows, data exchange details, and deliverables for various management and operation functions such as ordering, billing, inventory management, and SLA Management. It provides details on data interactions between the contractor, GSA and the government customers. It includes requirements for direct interaction between GSA's next-generation network solutions management system (“the GSA system”), and the contractor's Business Support System as described in Section G.5. Diagram J.2.1.1 shows the high-level process flow relating to acquisition/proposal/quote (task order), ordering, billing and Inventory management.. A Word version of the document has been posted in addition to the PDF version previously available.

241
Upload
Share

Views: 1067

Comments

aramey
<p><span style="font-family: arial, sans-serif; font-size: 12.8000001907349px;">The files are in a standard format and packaged as multiple zip files to allow us to upload them to Interact. For the final release of the RFP we plan to make the files available as web URLs.</span></p><div>&nbsp;</div>
sljoshi04
<p>In addition to the word and pdf versions of J.2, GSA posted WSDL and XSD files.&nbsp; Could GSA post these in standard file formats?</p>
The Enterprise Infrastructure Solutions (EIS) contract will be the main component of the future telecommunications portfolio that GSA is defining... More

To stay informed on the group's latest updates, subscribe here.

  • leif.powell's picture
    leif.powell
  • lbeddingfield's picture
    lbeddingfield
  • lief's picture
    lief